Morth 5th revision free download. MORTH Specifications on Roads & Bridges 2013 2019-01-31

Morth 5th revision free download Rating: 5,4/10 106 reviews

MORTH SPECIFICATIONS 5TH REVISION DOWNLOAD

morth 5th revision free download

Work includes providing electric supply, all electrical items like lights, fans and complete wiring, providing water supply including all pipes, fittings, tanks, tube well, pumps, valves etc. The works shall include work of any kind necessary for the due and satisfactory construction, completion and maintenance of the works to the intent and meaning of the drawings and these Specifications and further drawings and orders that may be issued by the Engineer from time to time. All dimension and levels shown on the drawings or mentioned in documents forming part of or issued under the Contract shall be verified by the Contractor on the site and he shall immediately inform the Engineer of any apparent errors or discrepancies in such dimensions or levels. The working Bench Marks shall be at the rate of four per km and also at or near all drainage structures, over-bridges and underpasses. The average thickness of the pavement course in any area shall be the arithmetic mean of the difference of levels before and after construction at all the grid points falling in that area, provided that the thickness of finished work shall be limited to those shown on the drawings or approved by the Engineer in writing. The quality of materials, processing of materials as may be needed at the site, salient features of the construction work and quality of finished work shall comply with the requirements set forth in succeeding sections. The Contractor shall take every precaution to reduce the levels of noise, vibration, dust and emissions from his plant and shall be fully responsible for any claims for damages caused to the owners of property, fields and residences in the vicinity.

Next

Section 100 (MORTH, 4th Revision)

morth 5th revision free download

Additionally, if so directed by the Engineer, the road surface shall be hosed or watered using suitable equipment 111. At night, the passage shall be delineated with lanterns or other suitable light source. All these have detrimental effects on durability of roads but unfortunately it is only the engineers who are blamed for early damage of the road. Such works shall be taken up by the Contractor only after obtaining clearance from the Engineer and ensuring adequate safety measures. In every case, the work shall be carried out to the satisfaction of the Engineer and conform to the location, lines, dimensions, grades and cross-sections shown on the drawings or as indicated by the Engineer. Clearance shall be effected immediately by manual sweeping and removal of debris, or, if so directed by the Engineer, by mechanical sweeping and clearing equipment, and all dust, mud and other debris shall be removed entirely from the road surface.

Next

Morth Specifications 5th Revision Pdf Free Download

morth 5th revision free download

The alignment and longitudinal section of diversion including junctions and temporary cross drainage provision shall be as approved by the Engineer. The lines and the levels of formation, side slopes, drainage works, carriageways and shoulders shall be carefully set out and frequently checked, care being taken to ensure that correct gradients and cross-sections are obtained everywhere. The methodology and the sequence shall be so planned as to provide proper safety, drainage and free flow of traffic. The Contractor must take all reasonable steps to minimise dust nuisance during the construction of the works. The temporary travelled way shall be kept free of dust by frequent applications of water, if necessary. Where the drawings and Specifications describe a portion of the work in only general terms, and not in complete detail, it shall be understood that only the best general practice is to prevail, materials and workmanship of the best quality are to be employed and instructions of the Engineer are to be fully complied with.

Next

Civil Engineering eBooks: MORTH & IRC Codes

morth 5th revision free download

The quality of materials, processing of materials as may be needed at the site, salient features of the construction work and quality of finished work shall comply with the requirements set forth in succeeding sections. Notwithstanding the above, the measurements may be taken at closer intervals also, if so desired by the Engineer, the need for which may arise particularly in the case of estimation of the volume of the material for profile corrective course levelling course. The Engineer will provide the Contractor with the data necessary for setting out of the center line. The Contractor shall furnish, at least 15 days in advance, his programme of commencement of item of work, the method of working he intends to adopt for various items of work such as site clearance, construction for embankment, sub-base, base, surfacing, culverts, bridges, retaining walls, well-sinking, cast-in-situ piling, construction of cast-in situ prestressed concrete simply supported girders, cantilever construction of prestressed concrete superstructure, and such other items for which the Engineer demands the submission of the method of working. About eMinds Legal is a Corporate Law Firm based in Gurgaon, India specializing in Corporate Legal, Corporate Secretarial and Compliance.

Next

Morth Specifications 5th Revision Free PDF Book

morth 5th revision free download

Before taking up any construction, an agreed phased programme for the diversion of traffic on the highway shall be drawn up in consultation with the Engineer. Programme relating to pavement and shoulder construction shall be an integrated activity to be done simultaneously in a coordinated manner. Use of Nuclear Gauges Nuclear gauges shall be used only where permitted by the Engineer. It is one of the common causes of failure where without proper investigation of existing pavement composition with impervious bituminous layers underneathfresh non bituminous layer has been laid over existing road surface. The work of setting out shall be deemed to be a part of general works preparatory to the execution of work and no separate payment shall be made for the same.

Next

Morth specification for road and bridge works civil engineers

morth 5th revision free download

Control of Soil Erosion, Sedimentation and Water Pollution The Contractor shall carry out the works in such a manner that soil erosion is fully controlled, and sedimentation and pollution of natural water courses, ponds, tanks and reservoirs is avoided. The Contractor will be the sole responsible party for safe-guarding all survey monuments, bench marks, beacons, etc. In order to facilitate the setting out of the works, the centre line of the carriageway or highway must be accurately established by the Contractor and approved by the Engineer. Measurements of Lead for Materials Where lead is specified in the Contract for construction materials, the same shall be measured as described hereunder: Lead shall be measured over the shortest practicable route and not the one actually taken and the decision of the Engineer in this regard shall be taken as final. The work to be carried out under the Contract shall consist of the various items as generally described in the Tender Documents as well as in the Bill of Quantities furnished in the Tender Documents. If at all, it would be detrimental. The work of building in quality assurance shall be deemed to be covered in the scope of the work.

Next

Fifth Revision of Specification for Road and Bridge Works

morth 5th revision free download

General The Contractor shall take all precautions for safeguarding the environment during the course of the construction of the works. Different items of work shall be measured in accordance with the procedures set forth in the relevant sections read in conjunction with the General Conditions of Contract. Where it is necessary to use some substances which can cause injury to the health of workers, the Contractor shall provide protective clothing or appliances to his workers. Measurement of distances shall be done preferably using precision instruments like Distomat. The Contractor shall, in connection with the staking out of the centre line, survey the terrain along the road and shall submit to the Engineer for his approval, a profile along the road centre line and cross-sections at intervals as required by the Engineer.

Next

Morth Specifications 5th Revision Pdf Free Download

morth 5th revision free download

The construction of temporary diversion including temporary cross drainage structures as described in Clause 112. He shall provide information regarding the details of the method of working and equipment he proposes to employ and satisfy the Engineer about the adequacy and safety of the same. A list of Indian roads Congress Specifications and Recommended Codes of Practice which have been made use of in the preparations of these Specifications is given at Appendix-1. Measurement of Bituminous Courses for Payment on Weight Basis Plant-mixed bituminous materials for pavement courses where designated to be paid on weight basis shall be weighed on accurate scales approved by the Engineer. Two copies of drawings, on the basis of which actual execution of the work is to proceed, shall be furnished free of cost to the Contractor by the Engineer progressively according to the work programme submitted by the Contractor and accepted by the Engineer. The stipulations in Clause 306 shall govern.

Next

Section 100 (MORTH, 4th Revision)

morth 5th revision free download

For your convenience, we have put all the books on our site with 100% secured On-line payment. Ordinarily, no construction traffic shall be allowed on pavement under construction unless authorised by the Engineer. It must then be accurately referenced in a manner satisfactory to the Engineer, every 50m intervals in plain and rolling terrains and 20m intervals in hilly terrain and in all curve points as directed by the Engineer, with marker pegs and chainage boards set in or near the fence line, and a schedule of reference dimensions shall be prepared and supplied by the Contractor to the Engineer. However, where work is allowed by the Engineer in longer stretches passing places atleast 20m long with additional paved width of 2. Morth Specifications for Road and Bridge Works, 5th Revision However, in recent morth specifications 5th revision some initiative from Government's end has been taken to develop the roads of the state. The Contractor shall establish working Bench Marks tied with the Reference Bench Mark in the area soon after taking possession of the site.

Next